House Wiring and Switchboard Upgrade

Works - Gaya

House Wiring and Switchboard Upgrade

One board rebuilt to IS 732 with a 30 mA RCCB, MCBs sized to the cable, and earth readings written down.

₹2,499

₹2,999

per visit
At Home

Choose a date

Verified professional
Pay after service
Reschedule anytime
Satisfaction assured

The Shuunnya promise

A 30 mA RCCB on every socket circuit, MCBs sized to the cable rather than the load, and earth readings handed to you in writing. We will not fit a bigger MCB to silence a trip.

  • Wired to IS 732 and the CEA safety regulations of 2010.
  • 30 mA RCCB upstream of every socket circuit, fitted as standard.
  • Cable drum label and MCB boxes left with you. Copper is checkable.
  • A 32 A MCB in front of 2.5 sq mm cable will not be fitted at any price.

Details

Rs 2,499 rebuilds one distribution board of up to 8 modules, wired to IS 732 and the Central Electricity Authority safety regulations of 2010. This is the one job on this page where the cheat can kill somebody, so it is set out in full. What goes in: an incomer isolator, a 30 mA RCCB covering every socket circuit, and a separate MCB per circuit sized to the cable and not to the load. The RCCB sits upstream of the socket MCBs. Whether the lighting circuit sits under it too is a genuine trade-off, protection against nuisance tripping in the dark, and we will explain it and let you decide rather than decide it for you. Cable, where we run it: 1.5 sq mm copper for lighting, 2.5 for a 6 A socket circuit, 4 for a 16 A socket circuit and 6 for a geyser or an air conditioner, all FR PVC insulated copper to IS 694. Earthing: every socket earth is tested for continuity and the readings written down. A house earth above 5 ohms is not an earth. If yours reads badly we tell you, quote an earth pit separately, and we will not sign off a board sitting on a dead one. The four cheats, named. Aluminium cable sold and billed as copper, which is why we leave the drum label with you. An MCB with a mark on it and nothing behind the mark, which is why the boxes stay with you too. An RCCB fitted where it protects nothing, or omitted altogether, which is the commonest board in this city. And the worst of them: a bigger MCB fitted to stop a nuisance trip. That is not a repair. A 32 A MCB in front of a 2.5 sq mm cable is a device that will let the cable burn before it trips, and we will not fit one at any price.

  • One board up to 8 modules, incomer isolator, 30 mA RCCB on every socket circuit, one MCB per circuit sized to the cable
  • Cable to IS 694: 1.5 sq mm lighting, 2.5 for 6 A sockets, 4 for 16 A, 6 for geyser and AC
  • Every socket earth continuity tested and the readings handed over in writing
  • Cable drum label and MCB boxes left with you, so copper and rating are checkable rather than claimed
  • Not included: a full house rewire at Rs 750 to Rs 1,400 per point with chasing and making good, an earth pit at Rs 3,500 to Rs 6,500, making good after chasing, the meter and anything on the supply side, and any load enhancement application
  • 12 months on our workmanship. The MCBs and RCCB carry their maker warranty and the boxes are yours
  • The Gaya roster is being built, so this page names a service area and no arrival time. There is no crew size printed here, no response-time promise and no arrival window, because we would be inventing all three.

Product information

What is included
Scope
One distribution board up to 8 modules, stripped, rebuilt and labelled circuit by circuit
Protection
Incomer isolator, a 30 mA RCCB covering every socket circuit, and one MCB per circuit sized to the cable rather than to the load
RCCB position
Upstream of the socket MCBs. Whether lighting also sits under it is a real trade-off between protection and nuisance tripping in the dark, and we explain it and let you choose
Cable
Where we run it: 1.5 sq mm copper for lighting, 2.5 for a 6 A socket circuit, 4 for 16 A, 6 for a geyser or AC point, all FR PVC insulated copper to IS 694
Earthing
Every socket earth tested for continuity and the readings written down and handed over. A house earth above 5 ohms is not an earth and we will say so
Evidence
Cable drum label and MCB boxes left with you, so the copper and the rating are things you can check rather than things we claimed
Time
One working day for a board change
What is not included
Full rewire
Rewiring the house is Rs 750 to Rs 1,400 per point including chasing and making good, quoted per point after a survey
Earth pit
A new earth pit is Rs 3,500 to Rs 6,500. We will not certify a board sitting on a dead earth, so if the reading is bad this is quoted before the board goes in
Making good
Chases are filled. Plastering, putty and paint over them are not in this price
Supply side
The meter, the service cable and everything before the meter belong to the distribution company. Touching them is an offence and we do not
Load enhancement
Applying to the distribution company for a higher sanctioned load is yours to do, and we will write down the figure you need
A false fix
An oversized MCB fitted to stop a nuisance trip, or an RCCB bypassed to make a fault go away, will not be done here at any price
Who comes, and what happens if it goes wrong
Vetting
Police verification through the local station for anyone entering a home, references from previous work actually contacted, and a trade test plus supervised jobs before the person carries a booking alone. A licence, where the trade has one, is checked against the issuing register and not against a photocopy.
Licence
Electrical work is one of the few home trades that does carry a real licence. A wireman permit and a contractor licence are issued by the Electrical Inspectorate, Government of Bihar, and we check them against the issuing register rather than against a photocopy, because a photocopy is what a lapsed licence looks like.
Employed or engaged
At launch the tradesperson may be engaged through our partner network rather than salaried. We say that plainly because the common cheat is a platform that advertises its own crew and dispatches whoever is free. The verification, the method, the checklist and the bill for a redo are ours either way.
Named before arrival
You are told the name of the person assigned and which trade licence they carry when the job is assigned, which may be shortly before the visit rather than days ahead.
Service area
Gaya town and up to 10 km beyond the municipal limit. A booking outside that area is refused at checkout rather than accepted and then missed.
Rework window
12 months on our workmanship. A return inside the window carries no second call-out charge
Who stands behind it
The 12 months is an undertaking from Shuunnya LifeStore, not from the individual who did the work, so it does not depend on that person still being on the roster
Not covered
Devices failing on their own, which is the maker warranty and the boxes are with you, faults on wiring we did not run, and anything altered by someone else afterwards
Damage
Damage caused by our tool or our hand is repaired at our cost. Brittle old insulation can crack when it is moved and we photograph that condition and show you before touching it

Ratings & reviews

Loading reviews...